Description
Laying of a geomembrane is carried out according to the plan of laying which determines the sizes and interposition of separate panels of a geomembrane.
On slopes the geomembrane is stacked so that it could be developed in the area of the maximum bias. Placement of a geomembrane in horizontal position meets these requirements.
Separate cloths of a geomembrane are placed so that there was no crossing of seams in one point. Separate cloths of a geomembrane connect among themselves a svarivaniye the special equipment.
For carrying out welding separate cloths of a geomembrane are placed with an overlap, both in longitudinal, and in the cross direction. Before beginning laying, it is necessary to make the plan of work with the designated welding seams.
The quantity of the seams made an extrusive way of welding has to be minimum. Insignificant deviations from this plan in progress in laying are possible only if they are coordinated with control authorities.